Overview
The Project is needed to improve congestion and vehicle traffic safety and provide additional access and connectivity for pedestrians and bicyclists at local interchanges through I-405 between Wilmington Av to Main St in the City of Carson. Three alternatives are being evaluated as part of the proposed Project. These include a no-build alternative and two build alternatives that feature auxiliary lanes, Complete Streets enhancements, and Transportation Systems Management (TSM) and Transportation Demand Management (TDM) strategies.
Status
The Project Study Report (PSR/PDS) was completed in October 2020. Project Approval and Environmental Document (PA&ED) phase started in November 2023, with the release of the Draft Environmental Document anticipated in early 2026. The PA&ED phase is anticipated to finish in 2026.