Fares
Regular Ride
$1.75/Ride
Senior 62+ / Medicare / Customer with Disability
$.75 peak
$.35 off-peak
K-12 and Community College Students
Free with GoPass
Low Income (LIFE)
20 Free rides/mo
Projects
Phase
Type
Location
Translate

Traffic Signal Light Pole and Foundation Removal on the north side of Wilshire Blvd. between Westwood Blvd. and Veteran Ave.

Summary  Metro contractors will remove traffic signals and foundations in Westwood from September 27 to October 8. Removal of the traffic signal light poles and foundations will be on the north side of Wilshire Blvd between Westwood […]

Streets & Freeways Subcommittee

Virtual Meeting CA, United States

Agenda Packet. The Streets and Freeways Subcommittee is a technical subcommittee of Metro’s Technical Advisory Committee (TAC). The Streets and Freeways Subcommittee meets on the third Thursday of every month […]

Construction Committee

Virtual Meeting CA, United States

Virtual - boardagendas.metro.net

Eastside Transit Corridor Phase 2 Meeting #4: City of Whittier

Virtual Meeting CA, United States

The reinitiated environmental process will include the development of a Recirculated Draft Environmental Impact Report (under CEQA) to update the 2014 Draft EIS/EIR. This process includes advanced conceptual engineering, environmental […]

I-710 South Corridor Vision and Goals Public Meeting

Virtual Meeting CA, United States

Metro and Caltrans are developing strategies for improving the I-710 South Corridor between its terminus in Long Beach and SR-60 in East Los Angeles. In planning for future projects and […]

Scroll to Top